We include this editable document in the Proposal Kit Professional. Order and download it for $199. Follow these steps to get started.
DOWNLOADABLE, ONE-TIME COST, NO SUBSCRIPTION FEES
What Our Clients SayI was very glad to have found Proposal Kit Professional back in 2000 (yes, 13 years ago when Ian and company decided to create PKP) - beforehand we were struggling with content and spending hours, if not days. building proposals for our clients. It was frustrating and painful. After purchasing PKP writing proposals has been a breeze!"
1. Get Proposal Kit Professional that includes this business document.
We include this Server Configuration Worksheet in an editable format that you can customize for your needs.
2. Download and install after ordering.
Once you have ordered and downloaded your Proposal Kit Professional, you will have all the content you need to get started with your project management.
3. Customize the project template with your information.
You can customize the project document as much as you need. You can also use the included Wizard software to automate name/address data merging.

On the eve of a SharePoint Server 2013 farm refresh, Northstar's IT team faced drifting network settings, unclear SMTP routes for the forget password feature, and missing records for services on web and application servers, putting a hospital compliance audit at risk.
They stabilized the project using a rigorous server configuration document to define base settings, IPv4/IPv6 addressing, and email notification paths, while using Proposal Kit's document creation tools to build the supporting migration proposal, risk register, and training plan; the AI Writer produced supplemental stakeholder briefings and a post-mortem report, and the RFP Analyzer aligned the package to the hospital group's procurement language.
Engineers updated the install worksheets to record the services by role, then used Proposal Kit's line-item quoting to cost farm servers, DNS changes, and rack with slide-rails work; managers used the AI Writer to generate a communications plan and an operations guide that explained how to modify network settings and monitor status and configuration after cutover.
The cutover completed on schedule with auditable network interface settings, stable email notification via the outgoing mail server, and a clean compliance trail; leadership approved the budget instantly thanks to clear quotes and polished Proposal Kit reports supporting the primary project management documents.
A manufacturing ERP upgrade required virtualization across production, test, and training, but competing build sheets, ad hoc serial port practices, and no clear plan to deploy Oracle VM Manager left server pool timelines slipping.
The team anchored execution on the server configuration document to define static IP address details, gateway, DNS server, and IPv6 address assignments for each host, then used Proposal Kit to create the business case, capacity study, and rollback plan; the AI Writer drafted a change-management playbook, while the RFP Analyzer mapped customer compliance asks into the supporting documents.
Admins registered VM server nodes, set BIOS and RAID controller baselines, and documented oracle ILOM access and https policies; Proposal Kit's line-item quoting captured costs for ethernet adapters, cable management arms, and Oracle VM Manager infrastructure, and the AI Writer generated a training schedule and lessons-learned template to reinforce consistency.
Atlas delivered a consistent runtime environment with configuration worksheets updated for each internet protocol version in use, faster recovery drills, and predictable costs, backed by Proposal Kit's polished analyses that complemented-without replacing-the core project management artifacts.
A fintech launch combined HMC-managed logical partitions for data services and Windows Server web tiers, but undocumented default admin accounts, scattered user ids and passwords, and no shared installation guide threatened security and schedule.
BlueRiver formalized a password policy, documented root and agent password rotations, and centralized network settings in the configuration record, then used Proposal Kit to assemble a vendor selection proposal, a security posture report, and a production readiness checklist; the AI Writer produced executive summaries and audit responses, and the RFP Analyzer ensured responses matched bank procurement criteria.
Engineers linked managed systems to call-home servers, set an SMTP server hostname for alerts, and captured serial connection procedures alongside supported operating systems, including Solaris 10 considerations; Proposal Kit's line-item quoting clarified hardware, firmware update windows, and system management tools, while the AI Writer generated contingency and capacity plans tied to the documented base settings.
The program launched with traceable configuration, monitored environments, and clean audit packages; stakeholders praised the clarity of the supporting Proposal Kit documents that reinforced, rather than altered, the underlying project management documentation.
This brief server configuration record captures only essentials-CPU, server admin contact, operating system version, and a key number. In practice, teams expand such a record into an install worksheet used during preinstallation to gather information, enforce consistency, and plan your installation across production environment, test environment, and training environment. A worksheet helps you plan base configuration settings, network settings, user ids and passwords, and services on server so the runtime environment remains stable and auditable.
Strong network planning comes first. Document whether you will use DHCP server or static IP address, the netmask, gateway, dns server, hostname, and whether the network interface will use IPv4 or IPv6. Record lan interface choices, ethernet adapters, ethernet connection details, and any serial connection or serial console requirements.
For remote management, log in to ILOM or similar tools only over https access, change the default admin account and default console password, and set an improved password policy for root password, agent password, database account password, and web service keystore. If email notification is needed, specify the smtp server hostname and outgoing mail server. For proactive support, note service authorization, call-home servers, and how call-home problem events are handled for managed systems on private or open network segments.
Hardware tasks should be tracked in a server installation task checklist: ESD precautions, rack compatibility, rack with slide-rails, slide-rail assemblies, cable management arm, back panel connectors, connect power cords, apply main power, BIOS and RAID controller setup, firmware update, and any preinstalled software configuration or Oracle Hardware Installation Assistant steps. Include supported operating systems and system requirements for a Windows operating system, Linux operating system, or Solaris 10 operating system, and reference the installation guide and install instructions.
Use cases vary by platform. For a SharePoint environment on Windows Server 2012 or supported operating systems Windows, record farm servers, streamlined topology, and roles for web servers and application servers. In Oracle VM deployments, capture configuration worksheets Oracle VM details: Oracle VM Server, Oracle VM Manager, OVS, vm manager screens, select interface for VM, server pool membership, Oracle Solaris VM and Oracle Linux VM boot options, GRUB menu settings, register VM server, and Oracle VM documentation references. On IBM Power platforms, track HMC access, HSCROOT password, IBM ID, logical partitions, IBM Installation Manager tasks, and Infosphere MDM or other user application component configuration to manage multiple servers.
Proposal Kit helps teams turn this simple record into a complete package using document assembly, automated line-item quoting, an AI Writer to build supporting documents, and an extensive template library, all designed for ease of use.
Beyond the basics, teams benefit from installation worksheets that make it easy to record the services each host will run, keep base settings defined, and align production test training cycles. Capture internet protocol versions in use and assign an IPv6 address where needed. Note how to modify network settings through oracle ilom or OS tools, including serial port access for headless racks. For legacy stacks, include supported entries for the Solaris 10 operating system (often seen as solar is 10 operating system in older checklists) so migrations and rollbacks remain predictable.
Workloads also drive details. In a SharePoint Server 2013 deployment, use worksheets to outline farm roles, service applications, and patch cadence, and ensure the forget password feature and other email flows have valid SMTP routes. In virtualization programs, plan to deploy Oracle VM Manager, define server pools, and integrate system management tools such as Oracle Enterprise Manager Ops Center to monitor status and configuration. These references help operations compare environments, validate change controls, and accelerate recovery.
Proposal Kit helps teams assemble these artifacts quickly. Its document assembly and extensive template library speed installation worksheets and environment guides, while automated line-item quoting streamlines cost rollups for production, test, and training. The AI Writer can write supporting policies and role-based procedures so base settings defined in planning carry into execution with clarity and ease of use.
Consider adding governance topics your first-pass record did not cover. Define capacity targets, storage tiers, and growth thresholds so teams can right-size hardware before go-live. Map backup and restore procedures by environment and verify recovery points during production test training cycles.
Capture time sources and certificate lifecycle plans to reduce drift and expired TLS issues. Include an access matrix for user ids and passwords with rotation schedules tied to your improved password policy, and document service accounts used by web servers, application servers, and user application components to prevent orphaned credentials during handoffs.
For platforms with HMC-managed logical partitions, include a topology map that shows managed systems, mobility requirements, and how call-home servers will report call-home problem events. Record which internet protocol versions are enabled, when to assign an IPv6 address, and how each network interface and LAN interface ties to security zones. Specify how email notification routes through the outgoing mail server and SMTP server, and where tickets are created when monitors detect change.
Add out-of-band details such as oracle ILOM policies, https access restrictions, serial port wiring, and procedures to modify network settings during maintenance windows. Track RAID rebuild steps, BIOS baselines, and firmware rollback criteria to avoid drift across server pools.
Virtualization and collaboration stacks benefit from deeper runbooks. For Oracle VM, define how you deploy Oracle VM Manager, register VM server nodes, and use Oracle Enterprise Manager Ops Center to monitor status and configuration without gaps. For a SharePoint Server 2013 farm, record the services and patch cadence by role, align OVS or hypervisor placement, and validate the forget password feature routes through the correct SMTP path. Include a legacy plan for the Solaris 10 operating system alongside Windows and Linux so migrations remain predictable across installation worksheets with base settings defined.
Proposal Kit can accelerate this level of detail by assembling consistent installation worksheets, component configuration guides, and environment summaries. Its document assembly, automated line-item quoting, AI Writer for supporting narratives, and template library help teams standardize plans, reduce rework, and communicate clearly across stakeholders.
Server Configuration
CPU SERVER ADMIN/Version OS Key number.
4.7 stars, based on 849 reviews
Ian Lauder has been helping businesses write their proposals and contracts for two decades. Ian is the owner and founder of Proposal Kit, one of the original sources of business proposal and contract software products started in 1997.
Published by Proposal Kit, Inc.We include a library of documents you can use based on your needs. All projects are different and have different needs and goals. Pick the documents from our collection, such as the Server Configuration Worksheet, and use them as needed for your project.